Membership
Username
Password
Business Opportunity
An outstanding China opportunity
Industry:  Province: 
Keyword:    
Investment Highlights - > 600,000 tons/year of Dry-process Cement Production Line Construction Project of Jinlang Industrial Co., Ltd. of Yanggao County


I. A Survey of the Project
i. Category: a new construction project; building material industry.
ii. Construction scale and content: to newly construct a 600,000-ton/year dry-process cement production line to produce 600,000 tons of slag cement using industrial waste residues a year.
iii. Implementation plan for construction conditions, raw and auxiliary materials, and public facilities: Longquan Industrial Park has completed the connection of sufficient water and electricity and convenient roads, and the leveling of land. Yanggao County is abundant in fine-grade limestone resource; the industrial waste residues discharged by the factories within it reach 460,000 tons. So the raw materials are guaranteed.  
iv. Site selection, regional conditions, and land occupied: the construction site of the project is located in Longquan Industrial Park with a land area of 200 mu (13.3 ha) and a building area of 20,010 square meters, 10 km from the county seat, 50 km far from Datong city, and 250 km far from Beijing. Within the county, there are several railways, like Beijing-Baotou Railway, Datong-Qinghuangdao Railway, Beijing-Datong Railway, and highways such as No. 109 National Highway, Zhangjiakou-Datong Highway, running crisscross in the county and all connected by roads and highways in the towns and villages. The regional advantage is obvious.  
v. Techniques and pattern selection of major equipment: a whole dry-process cement production line is composed of crushing limestone, compounding auxiliary materials (calcium carbide residues, gangue, yellow stone sand, ironstone etc), blending raw materials, clinkering, powdering and producing finished cement. According to the reality and the rigidity of raw materials, the pattern selection of major equipment is as follows: a) one TPC1616 single-stage hammer crusher; b) one φ3.5×10M central discharge drying mill plus combined powder concentrator; c) one PC12-1010 ring hammer crusher; d) one φ2.4×4.7M air-swept coal mill; e) one RF5/1000 five-stage cyclone preheater; and one φ3.3×50M rotary kiln; f) PE×250×1000M jaw crusher; g) one φ3.8×130M O-SEPA powder concentrator; h) BHYW-8 ROTO cement packing machine.
vi. Gross investment and its composition: gross investment is 126.0438 million Yuan, including 112.5488 million Yuan of capital construction and 13.5 million Yuan of circulating funds.
vii. Economic benefits prediction: after the production put into operation, it is estimated to realize an annual sales income of 93.6348 million Yuan; tax of 13.468 million Yuan; profits of 4.7175 million Yuan; rate of profit and tax to investment of 21.9%. The investment payback period will be five years.

II. Progression of the Project
The project feasibility study report has been compiled; and the environmental appraisal, requisition of land, and construction planning all have been finished.  

III. Mode of Cooperation
Cooperative.

IV. Contact Details

Address: No. 22, Yongshun Street, West Xinhua Road, Yanggao County
Contact person: Yao Yujun
Tel: 13903522385
Fax: 0352-6750290
Zip code: 038100



Go Back
Privacy Policy | Terms and Conditions © Copyright iSino 2006. All rights reserved.