Membership
Username
Password
Business Opportunity
An outstanding China opportunity

Construction of Baicheng Second Power Plant

I. The Brief Introduction of the Project
1. Project profiles: making use of the coal of the Huolin River to built large-scale thermal power base is the best choice and foundational way to solve the energy sources shortage during the period of the “eleventh five year plan” of Jilin Province and ease the imbalance between supply and demand. Baicheng Second Power Plant makes out to achieve the total installed capacity of 3.6 million kw (6×60) units, with the first phase project being 1.2 million kw units and an annual crude coal six million tons.
2. Mode of cooperation: exclusively owned enterprise
3. The total investment on the project and the registered capital: Baicheng Second Power Plant makes out to achieve the total installed capacity of 3.6 million kw (6×60) units, with the first phase project being 1.2 million kw units and an annual crude coal six million tons.
4. The investment needed from the foreign party: funds
5. Construction location: three factory sites for the enterprise, namely Yangshan, Tao Jiatun and Wu Jiahu 
6. The floor area and the construction area:
7. The estimated economic benefit: the output value is 1.44 billion Yuan, profit 840 million Yuan and the tax 270 million Yuan.
8. The estimated profit rate and the pay back period: the construction period is three years (from 2006 to 2009 planned), and the pay back period is nine years.
9. The process of the project: China Guodian Group and the Jilin Government cooperate to construct Baicheng Second Power Plant and signed the agreement of intent in February of this year, planning to achieve the total installed capacity of 3.6 million kw and invest 15 billion Yuan, of the total, the first phase of the project accounts for 4.8 billionYuan. The preliminary work of the project has already started and the outer condition of the project has basically been finalized: three factory sites namely Yangshan, Tao Jiatun and Wu Jiahu have been fixed; the feasibility research report of part railway has been finished and the review conference will be held for it soon. China Guodian Group has already entrusted the Northeast Electric Power Survey and Design Institute to make the feasibility research report, and reports it to the National Development and Reform Committee for approval.

II. The Chinese party profiles
1. The name of the enterprise:
The legal address:
The legal representative:
2. The profiles of the enterprise:
3. The construction and production condition available for the project: the natural resources such as the land and preferential policies
4. Contact methods
Communication location: Baicheng Development and Reform Committee
Postcode: 137000
Contact person: Ding Qinghai
Tel: 0436-3223702
Fax: 0436-3223702

Privacy Policy | Terms and Conditions © Copyright iSino 2006. All rights reserved.