I. The construction background of the project The total urban sewage quantity is 41160m3/d, with the total sewage pipe line in the city as long as 61.8 km. The exit of the sewage drainage lies in the southeast corner and the sewage will be drained into the Ming dyke and then to Da Caodian after being upgraded in sewage pump room in the ending.
II. The construction scale and the products blueprint The construction scale: 50,000 tons/day, six drainage pumping stations and 46 km of sewage line. The existing three pump stations and part of pipe lines will be rebuilt, adopting the technics of bio-oxidation tank.
III. Economic benefit forecast 20.075 million Yuan will be collected by the price of 1.10 Yuan/m3, and deducting the collection and operation cost, the annual profit will be up to 7.18 million Yuan.
IV. The total investment on the project The estimated investment: 191.17 million Yuan The sources of the funds: 101.1675 million Yuan is prepared by the locality and 90 million Yuan will be loaned from the bank.
V. The mode of the cooperation: exclusively investment, joint venture, cooperation or financing
VI.The construction site: Baicheng City, Jilin Province
VII.The process of the project: the project proposal, the feasibility research report and the preliminary design of the project and the environment evaluation have been authorized.
VIII.Contact methods Address: Baicheng Construction Committee of Jilin Province, China Postcode: 137000 Tel: 0436-3247732 Contact person: Guo Shuping, or Li Chuang Fax: 0436-3240684
|